
As part of a comprehensive modernization project, the entire emergency and safety lighting system in the building was redesigned. Our goal was to combine maximum safety, flexibility, and efficiency—tailored to the specific requirements of a high-rise building.
Before the modernization began, the building was equipped with a classic central battery system (CPS), as is often used in older buildings. However, due to the cabling costs and uncertainties regarding the compliance of the existing wiring on the upper floors with current standards, it was decided to switch to a combination of decentralized luminaires with individual batteries (WL) and a central battery supply.
A central element of the modernization was our dynamic escape route concept with innovative Flexway technology, which is linked to the fire alarm control panel.